Quick answer
To build a deck frame, start with an approved plan that shows how loads travel from the decking through joists, beams, posts, and footings. Use the spans, connections, and hardware specified for your design. In Harford County, review the county guidance and confirm inspection points before concealing any work.
Draw the supports and connections
Show the footing, post, beam, and joist locations. Identify whether the plan uses a house connection or independent supports. Confirm the design for the house wall before planning any ledger attachment.
Draw a side view before drawing every joist
Mark the intended top of the deck, the ground, door thresholds, and where stairs or landings will go. Add the thickness of the decking and the depth of the framing. The side view helps reveal a door or clearance problem while it can still be fixed on paper. Then draw the plan view to show which members run in each direction and where the supports meet them.
Trace the load path at each support
Follow one spot on the walking surface down through the joists, beam, post, and footing. Repeat near a stair opening and at the edge. If the drawing does not show how a member is supported or connected, flag that spot for design review. Use the cutaway below to follow the sequence. For a real design, show the connections, hardware, spans, and support details on the plan rather than guessing from the illustration.
How a deck frame carries weight
Review four points where the frame changes direction
Start where a joist meets a support and check how it is held in position. Follow that member to the beam, then trace how the beam meets its post. At the bottom, mark the post connection and footing. Draw a separate detail where the frame changes at an opening, an edge, or a stair. Each of those points can call for different hardware or support. Carry the detail references onto the main plan so the person building it can tell which connection applies where.
Take the same drawing to the permit review and use it again before covering the work. Keep the beam, post, and footing positions visible in the record. If you discover that a support lands on a different grade than you expected or that a proposed house connection cannot be confirmed, ask how to revise the drawing before substituting a fastener or moving a footing.
Confirm the selected decking dimensions before finalizing the walking surface and layout details. Deck board dimensions.
Use the Maryland Home Improvement Commission to check a contractor before hiring for the project.
| Connection | What the drawing should show | What to confirm |
|---|---|---|
| Joist to support | Direction and spacing | Member sizes for the span |
| Beam to post | Bearing and connection | Hardware and bracing |
| Post to footing | Location and support detail | Inspection timing |

Verify spans and hardware
Use the applicable tables and instructions for your material, spacing, loads, and connections. A joist span from another project may assume a different grade or layout. Mark hardware specifications directly on the drawing. Harford County publishes span tables and connection details.
Treat the house connection as a separate detail
Identify the wall construction and what the proposed fasteners would attach to. Check how water will be kept out of the connection. If you cannot verify the structure behind the finish, have the attachment reviewed before relying on it. A freestanding design needs its own support and bracing details. Compare those details alongside the cost and access requirements before choosing either layout.
Review the frame drawing before ordering
- Label the joist direction, beam and post locations, footing details, and connections where loads change direction.
- Mark access needed for digging, fasteners, and inspection, including any connection that decking would later hide.
- Take the plan and site photos to the county or a qualified reviewer. Record required changes on the drawing before you order materials from it.
Schedule checks before covering work
Ask the county which stages need inspection. Keep the required connections and supports visible until the inspector has reviewed them. If the site differs from the plan, resolve the change before continuing.
Prepare for the permit and inspection conversation
Bring dimensioned drawings, the house connection if there is one, and the footing and stair layouts to the county. Confirm which stages need to be inspected and whether any work must remain visible. Photograph the approved locations before covering them if you want a record for future repairs. When conditions in the ground or wall differ from the drawing, raise the difference before building past it.
Check your framing plan before review
Keep planning
Common questions
Can I copy a framing plan from a nearby deck?
Use it for layout ideas. Have the spans, connections, site conditions, and any house attachment checked for your own project. Bring dimensioned drawings, the house connection if there is one, and the footing and stair layouts to the county. Confirm which stages need to be inspected and whether any work must remain visible.
What should the drawings show for an attached deck?
Get the house connection and flashing details reviewed. Show the footing, post, beam, and joist locations. Identify whether the plan uses a house connection or independent supports. Confirm the design for the house wall before planning any ledger attachment. Mark the intended top of the deck, the ground, door thresholds, and where stairs or landings will go.
What should I check for a freestanding deck?
Check independent supports and bracing on the plan. Use the applicable tables and instructions for your material, spacing, loads, and connections. A joist span from another project may assume a different grade or layout. Mark hardware specifications directly on the drawing.
What if I plan to reuse old framing?
Have existing members and connections assessed before adding a new surface. Ask the county which stages need inspection. Keep the required connections and supports visible until the inspector has reviewed them. If the site differs from the plan, resolve the change before continuing.
Talk through your project
Tell The Detail Guys what you are working on and what you have found so far.